Site Data
| Acreage | Individual tracts ranging from 17 acres to 450 acres; can be subdivided or combined |
|---|---|
| Water | 12” and 16” lines, Breezy Hill Water and Sewer Co. in excess of 1 mgpd of capacity |
| Sewer | 8” and 12” lines, Breezy Hill Water and Sewer Co. 5 mgpd of capacity |
| Electric | 7.2 Kv, 12 Kv and 115 Kv lines, Aiken Electric Cooperative, and SCE&G |
| Natural Gas | 4” and 6” lines, Carolina Gas Transmission |
Sage Mill East is a South Carolina Department of Commerce Certified Site, meaning it has been thoroughly analyzed and documented by a thirdparty engineering firm. A Certified Site is considered to be “shovel ready” for acquisition and development. The site is also certified by McCallum Sweeney Consulting, suitable for alternative energy, food and beverage manufacturing, and other significant projects in the primary metals/metal fabrication or chemical industry.
